Project: | Research and demonstration project | Bioresources and hydrogen to methane as fuel - conceptual design of a pilot-scale plant |
Duration: | 2018 – 2023 (Phase 1a: Conceptual design and realization of a pilot scale plant) 2023 – 2026 (Phase 1b: Research operation and concept optimization of a pilot-scale plant) |
On behalf of: | Federal Ministry for Digital and Transport |
Research Objectives | Advanced Renewable Methane in Germany: Support and Guidance through Successful Piloting and Knowledge Transfer |
Project flyer
Biogenic resources to renewable methane
Find out more about the background and
objectives of the pilot project Pilot-SBG: bioresources