Development and demonstration of a hybrid CSP-biomass gasification boiler system
The aim of the project is to develop and demonstrate a new hybridization (solar/biomass) solution for an existing prototype of the REELCOOP project. A biomass gasification boiler will be developed and integrated in the CSP prototype 3 of the REELCOOP project, instead of the biogas boiler, allowing a direct comparison between the merits and disadvantages of the two biomass technologies in hybridization operation mode. Prototype 3 of REELCOOP is a hybrid renewable electricity production mini-power plant, composed of a CSP and a biogas boiler. The developed biomass gasification boiler operates with olive oil residues.
Overview | |
---|---|
Acronym | BIOSOL |
Status | Finished |
Promotion code/ jop number | 01DH16006A |
Promotion program | FP7 – Seventh European Cooperation work programme von 12.2006 |
Project duration | 01.10.2016 - 30.09.2019 |
Project partner | No information |
Investor | Bundesministerium für Bildung und Forschung (BMBF) |
Research interests | |
final report | - |
Contact | Dernbecher, Andrea |
Projekt website | https://www.dbfz.de/biosol |